# Configuration file boilerusage { # How much steam a pump will auto-output a tick. Can still be extracted from faster with a machine. I:pumpDrain=500 # The multiplier for how much steam is produced per tick with a pump. Steam production calculated by * * * . D:pumpMultiplier=1.0 # The amount of steam produced per boiler cycle. Water cost will always be 2x the resulting steam. I:steamPerBoil=800 # The amount of ticks needed for one boiler cycle, sans calculation. Actual value will be 200/( * . I:ticksToBoil=200 } multiblock { # The maximum amount of blocks that can be added to a standard multiblock. Some controllers may have different maxima. Includes all of the multiblock's components. I:defaultMaxMultiblock=1000 # The minimum amount of blocks that can be added to a standard multiblock. Some controllers may have different minima. Includes all of the multiblock's components. Set to 0 for no minimum. I:defaultMinMultiblock=36 } turbineusage { # base amount of rotors used to calculate a turbine's diminishing returns. RF generation will always be 2x the steam cost. I:rotorBaseCount=4 # The amount of steam consumed in a turbine with rotorBaseCount rotors. Used to calculate diminishing returns. RF generation will always be 2x the steam cost. I:steamBaseUse=40 # How much RF/T the turbine power tap can transfer. I:turbineOut=400 }